Energia i regulacje · 25.09.2003
Draft Construction Inspection Program for Reactors Built Under 10 CFR Part 52; Reopening of Comment Period
On May 30, 2003, the Nuclear Regulatory Commission (NRC) issued the "Draft 10 CFR Construction Inspection Program Framework Document," which set forth the basis for the construction inspection program for reactors built under 10 CFR part 52. The framework document details the proposed audits and inspections to be conducted by the NRC during the Early Site Permit (ESP) and Combined License (COL) phases. The document also discusses how the NRC staff will verify satisfactory completion of the inspections, tests, analyses, and acceptance criteria (ITAAC) and review operational programs. The original request for comments was contained in an announcement of a public workshop on issues related to the construction inspection program for reactors built under 10 CFR part 52 (68 FR 34012). The comment period expired on September 15, 2003. Comment periods for several other documents related to construction of reactors under 10 CFR part 52 were also occurring during the same time period. In order to allow all stakeholders an opportunity to provide comments on the Construction Inspection Program Framework Document, the Commission has decided to reopen the comment period until October 30, 2003. T