Regulacje i polityka gospodarcza · 16.10.2002
Intent To Prepare a Draft Environmental Impact Statement for the North Palm Beach County Project, Part 1 in Palm Beach County, FL
The Jacksonville District, U.S. Army Corps of Engineers (Corps), intends to prepare an integrated Project Implementation Report and Draft Environmental Impact Statement (DEIS) for the North Palm Beach County (NPBC) Project, Part 1. The study is a cooperative effort between the Corps and the South Florida Water Management District (SFWMD), which is also a cooperating agency for this DEIS. One of the recommendations of the final report of the Central & South Florida (C&SF) Comprehensive Review Study (Restudy) was the NPBC Project. This project includes 6 separable components that together will provide environmental, urban, and agricultural water supply needs, flood attenuation, and some water quality improvements for NPBC. The components include the Pal-Mar and Corbett Hydropattern Restoration, L- 8 Basin Modifications, C-51 and L-8 Basin Reservoir, Lake Worth Lagoon Restoration, C-17 Backpumping and Treatment, and C-51 Backpumping and Treatment.