BN Business News
Add your company to Business Communicator →

Regulacje i polityka gospodarcza · 13/12/2002

Environmental Impact Statements and Regulations; Availability of EPA Comments; Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and section 102(2)(c) of the National Environmental Policy Act as amended

EPA expressed environmental concerns regarding primary impacts as a result of project implementation. These include a large number of residential relocations, with many residences experiencing excessive noise increases and the loss of deciduous forest and surface water habitat. EPA requested that deletion of one or two proposed interchanges be evaluated. ERP No. D-FHW-F40409-IN Rating LO, IN-25 Transportation Corridor Improvements from I-65 Interchange to U.S. 24, Funding, Right-of-Way and U.S. Army COE section 404 Permit Issuance, Hoosier Heartland Highway, Tippecanoe, Carroll and Cass Counties, IN. Summary: EPA believes that the proposed project will result in minimum adverse impacts to the environment with the appropriate mitigation. No additional analyses are required. ERP No. D-FHW-K40253-CA Rating 3, Riverside County Integrated Project, Winchester to Temecula Corridor Construction of a New Multi- Modal Transportation Facility, Route Location and Right-of-Way Preservation, Riverside County, CA. Summary: EPA found that the DEIS was inadequate to satisfy the requirements of NEPA and lead to the selection of a preferred alignment containing the least environmentally damaging prac

Source: Federal Register — All DocumentsOpen original release →