Bezpieczeństwo i regulacje · 13.08.2003
Safety Zone Regulations, New Tacoma Narrows Bridge Construction Project
The Coast Guard is establishing temporary safety zones during the tow and moor operations of the caissons being used for the Tacoma Narrows Bridge construction project. The Coast Guard is taking this action to safeguard the public from hazards associated with the transport and construction of the caissons being used to construct piers for the new bridge. These safety hazards include, but are not limited to, hazards to navigation, allisions with the caissons, allisions with the caisson mooring system, and collisions with work vessels and barges. Entry into these zones is prohibited unless authorized by the Captain of the Port, Puget Sound or his designated representatives.