Regulacje i polityka gospodarcza · 15.12.2000
Griffin Springs Resource Management Project, Dixie National Forest, Garfield County, Utah
The Dixie National Forest, Garfield County, Utah, announced November 16, 1998, its intent to prepare an Environmental Impact Statement (EIS) that would analyze management proposals within the Aquarius Ecosystem Restoration Project. Because a portion of the area was affected by 36 CFR part 212, Administration of the Forest Development Transportation System: Temporary Suspension of Road Construction and Reconstruction in Unroaded Areas, and there are existing roadless areas within the project area, the project area was divided into smaller decision blocks. A Revised NOI for the Griffin Springs Resource Management Project was published in the Federal Register on July 26, 1999. Comments received during the AERP scoping period or in response to the original or revised NOI will be addressed in the GSRMP analysis. Since the revised NOI was published the GSRMP proposed actions and analysis area have been changed. The southern portion of the analysis area located on Barney Top has also been made a separate decision block, and the analysis area has been expanded to include an adjacent area located in section 8, T33S; R1E; SLBM that is experiencing tree mortality from bark beetles. The Propos