Regulacje i polityka gospodarcza · 6.10.1999
Automatic Train Control (ATC) and Advanced Civil Speed Enforcement System (ACSES); Northeast Corridor (NEC) Railroads
FRA postpones from October 1, 1999 to March 21, 2000, the date on which all trains operating on the Northeast Corridor between New Haven, Connecticut and Boston, Massachusetts (NEC--North End) must be equipped to respond to the new ACSES system.