Regulacje i polityka gospodarcza · 22/10/1997
Elimination of Prior Approval Requirements for Establishment Drawings and Specifications, Equipment, and Certain Partial Quality Control Programs; Correction
This document contains corrections to the final rule (Docket No. 95-032F) which was published Monday, August 25, 1997 (62 FR 45016). The final rule concerned the elimination of prior approval requirements for establishment drawings and specifications, equipment, and certain partial quality control programs.