Regulacje i polityka gospodarcza · 12.12.1997
Environmental Impact Statements and Regulations; Availability of EPA Comments
EPA expressed environmental concerns regarding the lack of a discussion as to whether a combination of structural and non- structural features may be a reasonable alternative, whether the project would comply with applicable Water Quality Standards, and the potential impacts and mitigation measures associated with using herbicides to control vegetation under the Channel Bypass Plan. EPA recommended that the FEIS incorporate pollution prevention features in the project's design, construction and operation. ERP No. DS-COE-G39002-00 Rating LO, Red River Chloride Control Project, Construction and Operation Methods, Updated and Additional Information, several counties TX and OK. Summary: EPA had no objection; however, EPA recommended that the description of the no action alternative be expanded to include the economic consequences of not developing additional water supply sources to users in the Red River Basin. ERP No. D1-COE-K35012-CA Rating EC2, Sacramento River Bank Protection Project, Implemention of Streambank Protection for the Lower American River between RM-0 and 13.7, Updated Information, City of Sacramento, Sacramento County, CA. Summary: EPA commended the Corps for the colla