Regulacje i polityka gospodarcza · 22.11.1996
Environmental Impact Statements and Regulations; Availability of EPA Comments
EPA had no objection to the selection of the preferred alternative described in the draft EIS. ERP No. D-COE-E30038-FL Rating EC2, Coast of Florida Erosion and Storm Effects Study Region III, Construction, Operation and Maintenance, Shore Protection Project, Palm Beach, Broward and Dade Counties, FL. Summary: EPA expressed some environmental concerns regarding the long-term consequences of how these actions will affect the ecology of the Florida shoreline. ERP No. D-COE-K36117-CA Rating EC2, Kaweah River Basin Investigation Feasibility Study, Flood Protection of Terminus Dam, Increase Storage Space in Lake Kaweah for Irrigation of Water Supply, Construction, Modification and Operation, San Joaquin Valley, Tulare and King Counties, CA. Summary: EPA expressed environmental concern with proposed mitigation and recommended selection of the Locally Preferred Plan (LPP) alternative which would address these adverse impacts while meeting project purposes. EPA also expressed concern with the potential adverse impact to riparian and oak woodland/savannah habitat. ERP No. D-COE-K39044-CA Rating EC2, Norco Bluffs Bank Stabilization Measures, Implementation, Riverside County Flood Control and