Energia i regulacje · 25.11.1997
Documents Containing Reporting or Recordkeeping Requirements: Office of Management and Budget (OMB) Review
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). 1. Type of submission, new, revision, or extension: Revision. 2. The title of the information collection: 10 CFR 50.55a, ``Codes and Standards; Amended Requirements.'' 3. The form number if applicable: Not applicable. 4. How often the collection is required: The ASME has set a frequency for conducting these activities with its attendant recordkeeping based on operating history and the need for component functionality. The frequency is dependent on the safety function of the component. The information is generally not submitted to the NRC, but is retained by the licensees to be made available to the NRC in the event of an NRC audit. Reporting requirements consist of one-time relief requests or technical specification amendments. 5. Who will be required or asked to report: Nuclear power plant licensees. 6. An estimate of the number of responses: The requirements will apply to licensees and applicants for nuclear power plant licenses. Because no applicants for construction permits or operating lice