Energia i regulacje · 12.02.1996
Reporting Reliability and Availability Information for Risk- significant Systems and Equipment
The Nuclear Regulatory Commission (NRC) is proposing to amend its regulations to require that licensees for commercial nuclear power reactors report plant-specific summary reliability and availability data for risk-significant systems and equipment 1 to the NRC. The proposed rule would also require licensees to maintain on site, and to make available for NRC inspection, records and documentation that provide the basis for the summary data reported to the NRC. The systems and equipment for which data would be provided are a subset of the systems and equipment within the scope of the maintenance rule.