BN Business News
Add your company to Business Communicator →

Rolnictwo i żywność · 21.12.1995

Intent To Prepare an Environmental Impact Statement for Land Use Authorization for Lakewood Raw Water Pipeline; Roosevelt National Forest, Boulder County, CO

The Arapaho and Roosevelt National Forests and Pawnee National Grassland is proposing to issue an easement to the City of Boulder Colorado to cross 5 miles of National Forest System lands with a replacement pipeline. The easement would allow the City to replace, maintain and operate Lakewood Pipeline. The pipeline is a raw water transmission line used to transport municipal water nine miles from Lakewood Reservoir to Betasso Water Treatment Plant. The City proposes to install the replacement pipeline in the vicinity of the 1906 pipeline, with some specific deviations to avoid potentially adverse impacts to environmentally sensitive areas. The proposal is for a 27- to 33-inch inside-diameter steel pipeline to be buried with a minimum of 4 feet of cover.

Source: Federal Register — Agriculture DepartmentOpen original release →