Energia i regulacje · 21/09/1994
Dairyland Power Cooperative Receives Confirmatory Order for Decommissioning of La Crosse Boiling Water Reactor
The US Nuclear Regulatory Commission has issued a confirmatory order to Dairyland Power Cooperative, authorizing the modification of its previous order to proceed with the decommissioning of the La Crosse Boiling Water Reactor, a facility operated by the cooperative.