Środowisko i energia · 27/12/1994
Notice of Final Sulfur Dioxide and Nitrogen Oxides Compliance Plans
The U.S. Environmental Protection Agency (EPA) is issuing final Acid Rain permits or Acid Rain permit revisions that include 5- year sulfur dioxide compliance plans according to the Acid Rain regulations (40 CFR part 72), for the following 21 utility plants: Charles R Lowman, E C Gaston, Gadsden, Gorgas, and James H Miller in Alabama; Crist, Lansing Smith, and Scholtz in Florida; Arkwright, Bowen, Hammond, Harllee Branch, McIntosh, Mitchell, Port Wentworth, Scherer, Wansley, and Yates in Georgia; and Jack Watson, R D Morrow, and Victor J Daniel in Mississippi. EPA is deferring final action on 5-year nitrogen oxides (NOx) compliance plans for the following 2 utility plants: Charles R Lowman in Alabama; and R D Morrow in Mississippi. These actions are deferred due to the decision rendered in Alabama Power v. U.S. EPA, No. 94-1170 (D.C. Cir. 1994), vacating the NOx rule (40 CFR part 76).